Monday, February 3, 2020

KDOT’s Cost Share Program accepting applications for spring 2020



After a highly successful first round of the Kansas Department of Transportation’s Cost Share Program last fall, a second round of applications are now being accepted for spring 2020. Applications will be accepted from Feb. 3 through April 15.

The Cost Share Program is designed to provide financial assistance that leverages state funding with local and private funding for projects related to economic development as well as job growth and retention. It will provide funding to local entities for construction projects that improve safety, increase the total transportation investment and help both rural and urban areas of the state improve their transportation system.

A minimum of 15% non-state cash match is required. Additional consideration will be given to project applications that commit more than the minimum required match amount. A portion of this funding is part of the remaining one-time $50 million approved this fiscal year by the Legislature and Gov. Laura Kelly, which requires a 25% minimum match.

All transportation projects are eligible, including roadway (on and off the state system), rail, airport, bicycle/pedestrian and public transit. They must be construction projects that address an important transportation need such as promoting safety, improving access or mobility, improving condition or relieving congestion. Selection criteria will include consideration of projects that meet program objectives, eligibility categories and requirements. Geographic distribution will also be considered during project selection.

An application form and a fact sheet on the Cost Share Program can be found at www.KSDot.org or with the links below: